U.S. Hydro-Mining Challenge 2.0
Washington's dams are a historically under utilized resource.
Proposal: U.S. Hydro-Mining Challenge 2.0
Subtitle: America’s Bitcoin Power Play—Green BTC, American Jobs, No Tax Dollars
Executive Summary
The U.S. Hydro-Mining Challenge 2.0 is a groundbreaking public-private partnership to retrofit dormant hydroelectric dams for off-grid Bitcoin mining, building a strategic Bitcoin reserve for the United States without spending a dime of taxpayer money or touching our seized BTC stockpile. We’ll auction three 5 MW dams in Washington to top U.S. miners, who’ll bid $7M+ each to fund and equip them. Over two years, they’ll compete on efficiency—BTC yield, uptime, innovation—with the winner earning the exclusive right to run a 50 MW nationwide hydro-mining network by 2035, plus a 10 MW bonus dam in 2028. The U.S. gets 117-142.5 BTC/year ($7-8.6M at $60K) from the pilot, scaling to 468 BTC/year ($28M) long-term, all branded as “America’s Green Bitcoin.” Jobs, energy independence, and a slap to China’s crypto dominance—delivered.
The Opportunity
Problem: The U.S. lags in Bitcoin mining (35% global hashrate vs. China’s past 70%), our dams sit idle, and Trump wants a BTC reserve without taxpayer cost.
Solution: Turn dormant Washington dams into green BTC powerhouses. Miners pay to play, carbon credits fill the gap, and we stockpile BTC while creating jobs.
Scale: Pilot 3 dams (15 MW, 234 BTC/year), grow to 50 MW (780 BTC/year) by 2035, with a bonus 10 MW dam (156 BTC) in 2028.
How It Works
Phase 1: Pilot Competition (2026-2027)
Assets: 3 non-operational 5 MW dams in Washington, retrofitted for off-grid hydro-BTC mining.
Cost: $45M total ($15M/dam).
Bidders: $21M+ ($7M min/dam, auctioned to miners like Marathon, Riot, CleanSpark).
Carbon Credits: $12M (300,000 tons at $40/ton, pre-sold to Microsoft/Amazon).
Rigs: $12M (bidders equip with S21s or better, satellite internet).
Output: 234 BTC/year base (78 BTC/dam), up to 285 BTC/year with innovation (95 BTC/dam). U.S. gets 117-142.5 BTC/year ($7-8.6M at $60K).
Competition: 2-year pilot. Miners ranked on:
BTC/kW (40%): Efficiency of rigs.
Uptime (30%): Reliability.
Cost (20%): Lean ops.
Innovation (10%): AI co-mining, ESG extras.
Incentives:
Jackpot: 15% of U.S. BTC (17.6 BTC/year, $1M) split by rank (1st: 50%, 2nd: 30%, 3rd: 20%).
Tiered Split: 1st: 55/45 (42.9 BTC bidder), 2nd: 50/50 (39 BTC), 3rd: 45/55 (35.1 BTC).
Jobs: 45-60 local hires (retrofit, ops).
Phase 2: Perpetual Program (2028-2035)
Prize: Winner runs 50 MW network (10-20 dams nationwide), mining 780 BTC/year (468 BTC to U.S. at 60/40, $28M at $60K).
Bonus: 10 MW dam in 2028 (156 BTC/year, 93.6 BTC to U.S.), funded by pilot profits.
Funding: Self-sustaining—pilot BTC ($7M/year) + credits ($20M+/dam) + winner’s capital ($7-10M/dam).
Why It’s a Win
For Trump:
Zero taxpayer or reserve cost—miners and credits pay 100%.
117-142.5 BTC/year pilot, 468 BTC/year by 2035 for the strategic reserve.
Jobs (50+), energy independence, and “Made in USA” BTC to beat China.
For Miners:
$7M bid + $5M rigs = $12M. At 42.9 BTC/year + jackpot (48.5 BTC, $2.9M at $60K), payback in 4.1 years; 2.5 years at $100K.
Prize: 312 BTC/year ($18.7M-$31.2M) on 50 MW—a $200M+ haul.
Green cred: “U.S. Hydro-Mined BTC” fetches 10-20% premium ($66K-$72K).
For America:
Green BTC counters crypto’s eco critics.
Revives dormant dams, no fossil fuels.
X buzz: “Marathon vs. Riot—America’s Mining Champs!”
Execution Timeline
April 2025: RFP launched—“U.S. Hydro-Mining Challenge: Bid for Green BTC Glory.”
May 30, 2025: Bids due ($7M min/dam).
June 15, 2025: 3 winners picked (e.g., Marathon $8M, Riot $7.5M, CleanSpark $7M).
July 2025: Retrofit starts; $12M credits locked with Microsoft.
Q1 2026: Mining begins, 234-285 BTC/year.
Q1 2028: Winner named, gets 50 MW program + 10 MW bonus dam.
2035: 50 MW network live, 780 BTC/year.
Competitive Edge
Auction: Bids hit $7-8M/dam with 50 MW prize dangling—$24M+ secured.
Innovation: AI co-mining (e.g., xAI workloads, $1-2M/dam) boosts output, ties to Musk.
Optics: Monthly X scoreboard (“CleanSpark: 95 BTC, 99% uptime”)—gamified hype.
Fallback: $9M WA state grant or BTC loans if credits stall—rock-solid funding.